Find or Sell any Parts for Your Vehicle in USA

Arias Pistons 12.5:1 Compression 82mm Bore Honda B-series on 2040-parts.com

US $499.99
Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Brand:Arias Manufacturer Part Number:3330420

Categories
WHY CHOOSE US
Arias Pistons 12.5:1 Compression 82mm bore Honda B-Series
Description

Honda/Acura B18c1 DOHC VTEC 
1.8L 
Stock Bore: 82mm
Stroke: 3.433
Rod: 5.430
Head CC: 41.6
Gasket: .028
Deck: .005
Compression Height: 1.180
Dome CC: 6
Compression Ration with Stock Head: 12.5:1 
Required Ring set: 1012303228



Payment is accepted only through Paypal.

We will only ship to the Paypal confirmed shipping address.

Payment for orders should be made within 5 business days.

Sales tax will be charged for orders from Florida.

If you require another payment arrangement, please contact us by email or eBay seller messages.
You may also like this

Are Jaguar planning to revive the Daimler badge?

Fri, 19 Apr 2013

The Jaguar XJ has always been an impressive car (well, if you ignore some of the periods of unreliability since it launched in the 1960s) and the last ‘traditional, 3-box XJ was very similar under the skin to the new swoopy coupe version that had transformed the fortunes of the XJ in the luxury car market. It just didn’t sell. That was changed with the latest XJ which comes with stunning (if, perhaps, slightly divisive styling).

Autoweek in review: What you might have missed

Fri, 09 Mar 2012

The Chevrolet Volt went low voltage as the factory prepares to suspend production for five weeks in March. The move is designed to reduce inventory of the hybrid sedan. Autoweek's Mark Vaughn got behind the wheel of the new Fiat 500 Abarth for a test drive.

London underpass to hold flood water

Mon, 10 Feb 2014

A PEDESTRIAN UNDERPASS is to be turned into an emergency pond to hold hundreds of thousands of litres of floodwater threatening homes and businesses in south London. The Purley Cross underpass will be used to hold water pumped from around 400 under-threat buildings in parts of Kenley and Purley and to stop a water treatment works which supplies tens of thousands of homes from flooding, Croydon Council said. The authority said the plan to use the underground footway to hold around 600,000 litres of water from tonight was approved after its "primary" pond at Purley Depot overflowed last night.